The site contractor is backfilling and compacting the trenches where the under-slab utilities were laid for the first cluster of homes. When this step is complete, peripheral shaped trenches will be prepared for the haunches (shallow frost walls). These will be lined with a four-inch insulation layer that extends across the whole platform under the concrete slab.