This morning, the site contractor finished getting the bottom of the pit down to grade. This is looking over the brink into an eleven-foot-deep hole where bedrock used to be.
This is where the water storage tank will be buried. A minute later, a loader smoothed out the temporary slope . . .
. . . and then they started laying a bed of crushed rock in the bottom for the concrete tank to rest on. The tank is due to be installed Thursday.