It’s beginning to look real. The first building has all three home types (one-bedroom type A, two-bedroom type B, and a type C, which nominally has three bedrooms, but this one has two bedrooms and a study).
The slab is insulated from the ground and wrapped in a vapor barrier that will extend up and over the whole building. All of the underground conduits and pipes are in place, and the carpenters are working fast.
The builder, the architect, and the structural engineer are checking to be sure everything is tight and sound.
And the main thing is that now we can stand in a home and get a realistic sense of the interior spaces.
